Discharge ship loader
Discharge of Sandvik ship loader at EMO Terminal - Rotterdam
On March 22nd early morning Biglifts’ Mv Happy River arrived safely at the EMO Terminal in Rotterdam with a new Sandvik ship loader. The rest of the day and the next day were used to successfully discharge the partly dismantled loader at the new quay by means of Happy River powerful heavy lift cranes.
The heaviest lift in this operation was 485 metric tons. This operation has been carefully planned and engineered in close cooperation with Sandvik and with the EMO.
BigLift is proud to contribute to the development of this new quay of the EMO terminal.